PESO Authorised Competent Person & Inspector · SMPV (U) Rules, 2016
Engineering assurance that stands up to scrutiny

Pressure vessel safety, tested with authority.

Statutory inspection, testing and certification for compressed-gas storage, pressure vessels, safety valves, mobile tankers and vessels under fabrication—delivered by a PESO-authorised Competent Person and Inspector.

Rule-specific authorisationTechnical documentationField inspection support
Industrial pressure vessel inspection illustration
Competent Person + InspectorCoverage across Rules 18, 19, 33, 43 and 13(2), as stated in the company authorisation.
Rule 18Safety relief valve and excess flow valve testing
Rule 19Pressure testing of pressure vessels
Rule 33Safety certificate for compressed-gas storage
Rule 43Safety certificate for transport vehicles
Rule 13(2)Control certificate for vessels under fabrication
Statutory services

One specialist partner across the vessel lifecycle.

From fabrication-stage inspection to periodic testing and safety certification, each engagement is scoped to the applicable rule, vessel type and documentation requirement.

18

Safety Relief & Excess Flow Valves

Testing and certification of safety relief valves and excess flow valves fitted to pressure vessels, with test observations and applicable certification documentation.

19

Pressure Vessel Testing

Inspection and pressure testing of pressure vessels, including Horton spheres, mounded vessels and underground vessels within the authorised scope.

33

Compressed-Gas Storage Safety

Safety assessment and certificate issuance for compressed-gas storage installations, including applicable mounded, underground and spherical vessels.

43

Transport Vehicle Safety

Inspection and safety certification for vehicles transporting compressed gas, subject to vessel configuration, documents and applicable statutory requirements.

13

Fabrication Inspection

Inspector services for vessels under fabrication, including spheres, mounded, underground and cryogenic vessels, within the stated Rule 13(2) authorisation.

NDT

Supporting Technical Examination

Review and witnessing of relevant examination and test records as required by the approved scope, applicable code, vessel condition and inspection plan.

Detailed service scope

Inspection and certification services built around the applicable SMPV rule.

Clients usually search by an asset, a certificate or a statutory rule. The sections below explain how Pacific Engineering & Testing Services supports each requirement without reducing a technical assignment to a generic checklist.

Rule 18

Safety Relief Valve and Excess Flow Valve Testing & Certification

Pacific Engineering & Testing Services undertakes testing and certification assignments for safety relief valves, pressure relief valves and excess flow valves installed on pressure vessels handling compressed or liquefied gases. The service may include identification of the valve, visual condition review, verification of set-pressure information, witnessing of testing, observation recording and preparation of the applicable certification documents within the company’s authorised scope.

Typical enquiries include SRV testing for LPG bullets, relief valve testing for ammonia or industrial-gas storage, excess flow valve testing, valve calibration documentation and Rule 18 certification for continued statutory compliance.

  • Safety relief valve testing and certification
  • Excess flow valve functional testing
  • Pressure relief valve set-pressure verification
  • Valve identification and record review
  • Rule 18 inspection documentation
Rule 19

Periodic Inspection and Pressure Testing of Pressure Vessels

Rule 19 assignments cover inspection and pressure testing of pressure vessels within the recognition scope, including LPG bullets, propane vessels, industrial-gas vessels, Horton spheres, mounded pressure vessels and underground pressure vessels. The exact inspection plan depends on vessel design, service history, accessibility, previous reports, licence conditions and the statutory requirements applicable to the installation.

Pacific Engineering coordinates the review of available vessel records and the field inspection or witnessing required for the assignment. Supporting examinations may include ultrasonic thickness measurements and other relevant NDT records where required by the approved scope or inspection plan.

  • Hydrostatic or applicable pressure-test witnessing
  • Horton sphere inspection and certification support
  • Mounded vessel and underground vessel testing
  • LPG storage vessel periodic inspection
  • Review of NDT and thickness-measurement records
Rule 33

Certificate of Safety for Compressed-Gas Storage Installations

For organisations installing or operating compressed-gas storage systems, the Rule 33 service addresses the statutory safety assessment and certification of the installation within the authorised scope. Assignments may involve above-ground pressure vessels, LPG bullets, mounded storage vessels, underground vessels and Horton spheres together with their connected safety systems and installation documentation.

The purpose is not merely to inspect a vessel in isolation, but to examine the applicable installation details, available documents, safety arrangements and site conditions needed for the relevant Certificate of Safety.

  • Compressed-gas storage safety inspection
  • LPG bulk storage installation certification
  • Horton sphere safety certificate support
  • Mounded and underground vessel installations
  • Documentation for PESO licence or renewal processes
Rule 43

Certificate of Safety for Vehicles Transporting Compressed Gas

Pacific Engineering & Testing Services provides inspection and certification services for vehicles and mobile pressure vessels used to transport compressed or liquefied gases, subject to the company’s current Rule 43 authorisation and the precise vehicle or vessel configuration.

Enquiries commonly relate to LPG road tankers, industrial-gas tankers, mobile pressure vessels and transport units requiring a safety certificate supported by the applicable vessel, vehicle and inspection records.

  • Compressed-gas road tanker inspection
  • Mobile pressure vessel safety certification
  • LPG and industrial-gas transport vehicles
  • Review of tanker and vessel documentation
  • Rule 43 safety certificate assignments
Rule 13(2)

Inspector Services for Pressure Vessels Under Fabrication

As stated by the company, Pacific Engineering & Testing Services is authorised as an Inspector for issuance of a Certificate of Control for vessels under fabrication, including spheres, mounded vessels, underground vessels and cryogenic vessels. Fabrication-stage inspection is planned around the approved design, material records, welding and examination stages, pressure testing and final documentation applicable to the vessel.

Early coordination with the fabricator or EPC contractor helps identify witness points and documentation requirements before critical manufacturing stages are completed.

  • Pressure vessel fabrication inspection
  • Material and traceability-document review
  • Welding and NDT record coordination
  • Hydro-test or final-test witnessing
  • Certificate of Control documentation
Technical Support

NDT Records, Documentation Review and Compliance Coordination

Pressure-vessel certification assignments often depend on reliable supporting evidence. Depending on the rule, asset and agreed scope, Pacific Engineering may review or witness relevant NDT activities, thickness readings, prior test reports, drawings, data sheets, repair records and other technical documents necessary to establish the inspection basis.

Where specialist testing is performed by an external laboratory or agency, the records can be coordinated as part of the wider statutory inspection assignment.

  • Ultrasonic thickness measurement records
  • MPI, DPT, UT or RT report review where applicable
  • Previous certificate and licence-document review
  • Vessel data-sheet and drawing verification
  • Inspection planning and compliance coordination
Why authorisation matters

Not generic consultancy. Rule-specific statutory competence.

PESO publishes procedures and recognised-person resources for SMPV (U) compliance. Pacific Engineering & Testing Services presents itself as authorised for the specific rules listed here; clients should match every assignment to the applicable rule and current recognition scope.

Clear statutory scopeEach service is mapped to the relevant SMPV (U) rule.
Inspection-led documentationTechnical findings and certification are based on the applicable inspection and test process.
Lifecycle coverageSupport spans fabrication, installed storage vessels and mobile pressure vessels.
Applications

Built for high-consequence assets.

Serving organisations that store, handle, fabricate or transport compressed gases in pressure vessels governed by statutory safety requirements.

LPG & PropaneBulk storage installations, bullets, mounded vessels and associated safety fittings.
Industrial GasesOxygen, nitrogen, carbon dioxide, argon and other compressed-gas systems.
Chemical FacilitiesPressure vessels and gas storage used in chemical and process operations.
Road TankersMobile pressure vessels and vehicles transporting compressed gas.
Vessel FabricatorsStage-wise inspection support for vessels under fabrication.
Cryogenic SystemsApplicable cryogenic vessel fabrication and inspection assignments.
EPC ContractorsIndependent technical coordination for statutory inspection milestones.
Storage InstallationsAbove-ground, underground, mounded and spherical vessel systems.
Assets and vessel types

Technical coverage for static and mobile pressure-vessel systems.

The final scope is always matched to the current authorisation, applicable rule, vessel design and service conditions.

LPG Bullets and Bulk Storage Vessels

Inspection, pressure testing, relief-valve testing and storage safety certification enquiries for LPG bullets, propane vessels and bulk-gas installations.

Horton Spheres

Rule 19 pressure-vessel testing and Rule 33 installation safety certification within the stated authorisation for spherical storage vessels.

Mounded Pressure Vessels

Periodic inspection, testing and safety-certificate assignments for mounded LPG or compressed-gas vessel installations.

Underground Pressure Vessels

Inspection planning and certification support for underground storage vessels subject to access, records and applicable statutory requirements.

Road Tankers and Mobile Vessels

Rule 43 safety-certificate services for vehicles transporting compressed gas and related mobile pressure-vessel inspection enquiries.

Cryogenic Vessels

Fabrication-stage Inspector services for applicable cryogenic vessels under the stated Rule 13(2) scope.

Safety Relief and Excess Flow Valves

Rule 18 testing and certification for critical safety fittings used on pressure-vessel and compressed-gas installations.

Vessels Under Fabrication

Inspection coordination for spheres, mounded, underground and other pressure vessels covered by the company’s stated Inspector authorisation.

Based in Ghaziabad, serving industrial assignments

PESO inspection and pressure-vessel testing support from Muradnagar, Uttar Pradesh.

Pacific Engineering & Testing Services is located at Basantpur Saithli, Muradnagar, Ghaziabad. The location provides practical access to industrial areas across Delhi NCR, Ghaziabad, Noida, Greater Noida, Faridabad, Gurugram and neighbouring regions. Site mobilisation outside the region can be discussed according to the assignment, vessel type and inspection schedule.

For a faster quotation, share the plant location, gas or service, vessel capacity, previous inspection date, required SMPV rule and available PESO or technical documents.

Discuss Site Inspection →
Inspection workflow

A disciplined path from enquiry to certificate.

Scope review

Share the vessel, gas, capacity, location, rule requirement and current documentation.

Document check

Relevant drawings, prior certificates, licence records and test history are reviewed.

Field inspection

The applicable inspection, witnessing or testing activity is performed and recorded.

Reporting

Findings and applicable certification documentation are completed for the agreed scope.

Frequently asked

Practical answers before you schedule.

What is a Competent Person under the SMPV (U) Rules?

A Competent Person is recognised for defined functions under specified rules. Recognition is scope-specific; the correct competent person and rule must be matched to the inspection or certification required.

What is the difference between a Competent Person and an Inspector?

In broad terms, the competent-person functions listed here relate to testing and safety certification under Rules 18, 19, 33 and 43, while the stated Inspector authorisation under Rule 13(2) relates to control certification for vessels under fabrication.

How often must a pressure vessel or safety valve be tested?

The applicable interval depends on the vessel category, service, licence conditions, statutory provisions and any directions or amendments in force. Pacific Engineering reviews the documents and advises the scope before inspection; the website does not substitute for the governing rule or licence condition.

Which documents should we share with an enquiry?

Typically: vessel identification and capacity, gas/service, location, drawings or data sheet, current PESO licence details where applicable, previous certificates, repair history and the required rule or certificate.

Can you inspect Horton spheres, mounded and underground vessels?

The company’s stated authorisation includes these vessel categories under the relevant Rules 19 and 33 scope. Final acceptance depends on the current recognition document and the precise assignment.

Do you provide PESO pressure-vessel testing in Ghaziabad, Noida and Delhi NCR?

Pacific Engineering & Testing Services is based in Muradnagar, Ghaziabad and can assess inspection requirements in Delhi NCR and other locations. Mobilisation is confirmed after reviewing the vessel type, site location, applicable rule and inspection scope.

What information is required for an SRV or relief-valve testing quotation?

Share the number and type of valves, service or gas, set pressure, vessel or installation details, site location, previous test information and the required Rule 18 certification scope.

Can you support a new pressure vessel during fabrication?

The stated Inspector authorisation under Rule 13(2) covers Certificate of Control assignments for specified vessels under fabrication. Contact the team before fabrication advances so that drawings, materials, welding records, inspection stages and witness points can be reviewed.

Is NDT included in pressure-vessel testing?

NDT requirements depend on the vessel, rule, condition, service history and approved inspection plan. Relevant examinations and reports may form part of the supporting evidence, but the precise requirement is confirmed only after document and scope review.

Start an enquiry

Tell us what needs to be inspected.

Share the vessel type, gas, capacity, location and required certification. The enquiry will open in WhatsApp with the entered details.

Phone & WhatsApp+91 93541 28733
Registered Address

Khasra No-687, Hisali Road, Basantpur Saithli, Muradnagar, Ghaziabad, Uttar Pradesh – 201206

GSTIN

09AKKPK5335N2ZK

WA